Dear All,
We have been experiencing a problem with button 2, on the 8 channel button box at the 4T. Because of complicated aspects of its construction, we need to send it back to the vendor for repairs. We plan to send the box back on Wednesday, January 14th, after the last scan of the day. We anticipate not having the button box on Thursday - Monday (Jan 15th - 19th), and having it up and running for the first scan on Tuesday the 20th. Currently no scans have been scheduled during this time frame that require this device. If you use the 8 channel button box at the 4T, please keep this availability in mind as you schedule.

The 4T is fully operational, only studies that require the 8 channel button box at the 4T are affected. There should be no impact on scheduling or button box availability on the 3T.

Thanks!
Michele
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Michele T. Diaz, Ph.D.
Assistant Director
Brain Imaging and Analysis Center
Hock Plaza
2424 Erwin Rd, Suite 501, Room 5162
Duke University
Durham, NC 27710
P: (919) 681-9528
F: (919) 681-7033
mtd3@duke.edu
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
  Previous Topic Topic Next Topic  
 Forum Locked
 Printer Friendly
Jump To:
BIAC Forums © 2000-2010 Brain Imaging and Analysis Center Go To Top Of Page
This page was generated in 0.44 seconds. Snitz Forums 2000