Duke-UNC Brain Imaging and Analysis Center
BIAC Forums | Profile | Register | Active Topics | Members | Search | FAQ
Username:
Password:
Save Password   Forgot your Password?
 All Forums
 Announcements
 Operational Announcements
 Cluster scheduled downtime 3/25-3/26
 Forum Locked
 Printer Friendly
Author Previous Topic Topic Next Topic  

petty
BIAC Staff

USA
453 Posts

Posted - Mar 23 2012 :  09:56:46 AM  Show Profile

I will be locking the majority of cluster nodes for job submissions on Sunday afternoon ( 3/25 ) in preparations for maintenance on Monday afternoon ( 3/26 ).

They will be locked to give running jobs a chance to finish before i have to turn off nodes.

I'll be installing additional memory into at least 20 nodes on Monday afternoon. The nodes will be brought back up and put online as i progress, so the cluster won't be down entirely and will be back up and stronger than ever by Monday at 5pm.

Thanks,
-Chris

petty
BIAC Staff

USA
453 Posts

Posted - Mar 26 2012 :  6:04:24 PM  Show Profile
Everything is back up and on.

The maximum amount of ram is now 187G.

There are 8 nodes, which can handle this amount.

-Chris
Go to Top of Page
  Previous Topic Topic Next Topic  
 Forum Locked
 Printer Friendly
Jump To:
BIAC Forums © 2000-2010 Brain Imaging and Analysis Center Go To Top Of Page
This page was generated in 0.53 seconds. Snitz Forums 2000