Unscheduled Downtime The entire network on Hock Plaza 5th floor was down due to a UPS failure. DHTS is replacing the UPS.
Impact
- You may not have been able to logon to any Windows computer.
- Print queues were unavailable.
- Computers on Hock 5th floor could not connect to the network.
- BIAC wiki was unavailable.
- Cluster jobs may have failed.
-Francis
|
IT Director, Brain Imaging and Analysis Center |
|